Home · Materials · BOQ & Estimator
Quantity surveying
BOQ & Estimator
Build a bill of quantities for a whole job. Add each work item — concrete, RCC, brickwork, plaster, flooring, paint, steel — and the estimator runs every one through the same calculation engine and totals the cement, sand, aggregate, bricks and steel, with a grand cost you can print.
Material rates (used for all items)
Add work items
Bill of quantities
| # | Item | Key quantities | Cost |
|---|
Consolidated materials
How it works
Each item you add is computed with the same maths as the individual calculators — wet volume scaled to dry volume, split by mix ratio into cement, sand and aggregate; bricks from wall volume; steel from d²/162 or a kg-per-m³ slab figure. The estimator then sums identical materials across every item so you order cement once, sand once, and so on, and applies your rates for a grand total.
This estimates materials and their cost. Add the labour cost calculator for the labour side. Quantities are for planning — confirm against drawings and a detailed BOQ before ordering.